Beat the clock and the weather

Designed to give you a guaranteed set time through a choice of three available products - Sureset helps beat bad weather and meet deadlines. 

Enrich your project. Contact us today about Sureset.

Contact us
Technical information
ComplianceGenerally complies with AS1379
MSDSAvailable
Applications
  • All concrete - whenever set time is important
  • Cold weather - when concrete traditionally takes longer to set
Features and benefits

Guaranteed set times

Sureset uses special additives to give a range of guaranteed set times, which is perfect for tight deadlines, cold weather or when standard concrete takes longer to set. Available in three levels to suit a range of temperature conditions and applications.

Sureset TypeTemperature at final discharge point
5-10°C11-15°C16-24°C25-35°C
Bronze8hrs7hrs6hrs5hrs
Silver7hrs6hrs5hrs4hrs
Gold6hrs5hrs4hrs*3hrs*
WARNING - Time may be considerably less than specified so site provisions should be made for a faster set.
*Not available in all areas

Get more done

More time for other jobs and less time waiting for a pour to set by having a guaranteed set time. Strength permitting, Sureset lets you remove and start reusing formwork sooner than with regular concrete, allowing a quick set time in high foot traffic areas, like footpaths.

Beat bad weather

Arrange a morning pour when it looks stormy in the afternoon, or pour at noon and be finished by 3pm (in certain circumstances). Even in 5°C air temperature, concrete finishing takes just 6 hours with Sureset Gold.